A crew day rate is a quote. Your budget needs the cost, and they are not the same number

Ask a gaffer, a first AD or a script supervisor for their day rate and you will get one number. Put that number in your budget, multiply it by the number of shoot days, and you will be wrong — reliably, and always in the same direction. A quoted day rate covers labour for an agreed length of day, on the days the production actually books. Everything else that ends up on the payroll report — overtime, night and weekend premiums, kit fees, prep and travel days, employer taxes, benefit contributions, the payroll company's handling fee — sits outside that number and gets added to it.

This page breaks a crew rate down into the parts a budget has to carry separately: what the quote includes, what the schedule adds on top, what the payroll system adds after that, and where each figure actually comes from. It deliberately quotes no amounts. Rates differ by territory, by department, by union agreement and by season, and a figure copied from an article is out of date the moment an agreement is renegotiated. What does not change is the structure — and the structure is what decides whether your crew line holds from the first version of the budget to the final cost report.

  • A quoted rate buys labour for an agreed length of day, not an open-ended day
  • Overtime, night, weekend and holiday premiums are triggered by the schedule, not by the budget
  • Kit fees and box rentals are equipment, quoted separately from labour
  • Prep, travel and wrap days rarely sit at the shoot rate
  • Fringes and payroll handling are calculated on gross wages, on top of the rate
  • Union agreements set floors, not market rates — heads of department sit above them
  • The number of days comes from the shooting schedule, so the crew line moves when the schedule moves
Three crew members rigging a large film light on a cherry picker during an exterior location shoot
Every position on a call sheet is a rate, a number of days and a stack of costs that the rate alone never shows.

What a quoted day rate actually covers

The quote you receive is a labour price for a working day of an agreed length, on the days you book. It is not a price for the position, and it is not a price for the week. Two misreadings follow from treating it as either. The first is budgeting the crew line as rate times shoot days, which omits prep, travel and wrap entirely. The second is assuming the rate absorbs whatever the day turns into — that a twelve-hour call on a rate agreed for a shorter day costs the same. It does not, and the difference arrives on a timecard you will see weeks later. Knowing which elements sit inside the quote and which sit outside it is the whole job.

What a quoted crew day rate includes, and what it does not
Cost elementInside the quoted rateWhere it actually comes from
Labour for a working day of agreed lengthThe rate negotiated in the deal memo
Hours beyond the agreed dayOvertime bands, triggered by how the day actually runs
Night, weekend and public holiday workPremiums set by agreement or by local law
Personal kit and box rentalA separate kit fee, quoted per day or per week
Prep, travel and wrap daysUsually a different rate, agreed up front
Employer taxes and benefit contributionsFringes, calculated on gross wages
Payroll service handlingA percentage charged by the payroll provider
Per diems, travel and accommodationTravel and logistics lines, never the labour line

Day rate, weekly rate, and the length of a day

Crew are hired on day rates or on weekly rates, and the two are not interchangeable. A weekly rate buys a defined number of working days, and dividing it to produce a day rate removes the discount the production was given for booking continuity — which is exactly why the crew member quoted a week in the first place. More importantly, both rates are quoted against an assumed length of day. Whether that assumption is ten hours, twelve, or something set by an agreement, it is the hinge of the whole deal: the same rate against a shorter day is a materially more expensive hire, and the same rate against a longer day is a materially cheaper one. A rate recorded in a budget without the day length it assumes is an incomplete figure, and it will be read wrong by whoever inherits the file.

Overtime is decided by the schedule, not by the budget

This is the part productions consistently treat as a contingency when it is in fact a consequence. Overtime, premium hours, short turnaround between wrap and the next call, meal penalties where an agreement provides for them — none of these are random. They are the direct result of planning decisions: a scene moved to a night, a pickup day scheduled on a weekend, a company move that eats two hours, a sixth day added to hit a delivery date. Each of those choices has a payroll price, and that price is set when the decision is made, not when the timecards arrive. A budget whose crew line does not move when the shooting schedule moves is not a stable budget — it is a wrong one that will correct itself in the cost report, in the wrong direction.

Kit fees are equipment, not wages

Many crew members bring their own tools: a sound mixer's bag, a script supervisor's rig, a gaffer's personal kit, a DIT's hardware and licences. That equipment is normally charged as a kit fee or box rental, quoted per day or per week, separate from the labour rate. Keeping it separate matters for three reasons. It is usually treated differently from wages for tax and fringe purposes, so folding it into the rate quietly inflates everything calculated on gross wages. It belongs to the equipment side of the budget, where it can be compared against the cost of renting the same gear. And it does not scale with the day the way labour does — a long day costs more in overtime, not more in kit. Productions that negotiate a single blended figure lose all three distinctions at once.

Prep, travel and wrap days are where the day count goes wrong

The crew line is a rate multiplied by a number of days, and the number of days is almost never the number of shoot days. Heads of department prep for days or weeks before the first call: the production designer and the gaffer early, the first AD through the whole schedule, the script supervisor from the final draft onwards. Travel days to and from a location are usually paid, often at a reduced rate agreed in advance. Wrap and return of equipment takes time after the last shot. Each of those blocks is visible in the shooting schedule, which is precisely why the day count should be read from the schedule rather than estimated. Estimating it is how a department is budgeted at twenty days and invoiced at twenty-nine.

Rate floors: unions, agreements, and what they do and do not tell you

In most territories where crews work regularly, some form of collective agreement sets minimum rates by position — union agreements in North America and the UK, industry-wide collective agreements in continental Europe. In France, for instance, rates for film and television technicians sit above floors fixed by branch collective agreements and revised by periodic amendments, with adjusted floors for lower-budget features; Soldum checks engagements against those French minimums, which matters if you shoot in France or co-produce there. Wherever you are, the principle is the same and so is the limit: a floor tells you what you cannot pay below, never what a position costs. On in-demand roles, market rates sit well above the floor, and the gap widens whenever several productions are crewing in the same window. Budgeting an entire crew at the floor produces a plan that is roughly right on junior positions and badly short on heads of department — the ones carrying the largest numbers.

From a quoted rate to a budgeted line

Turning rates into a crew budget means carrying every layer separately and keeping each one attached to the thing that actually drives it. The order below is the order in which the layers stack, and the right-hand column is the point: the difficulty is never knowing that these costs exist, it is keeping them current while the schedule is still moving. A spreadsheet knows the rates, because someone typed them once. It does not know that two days moved to nights last Thursday.

From a quoted day rate to a budgeted crew line
StepWhat it addsWhere the data lives
Quoted day or weekly rateStarting pointThe deal memo
Days actually bookedPrep, shoot, travel, wrapThe shooting schedule
Hours beyond the agreed dayOvertime at band ratesDaily timecards
Night, weekend and holiday workPremiums, often cumulativeThe schedule and call sheets
Kit fee or box rentalEquipment the crew member bringsDeal memo, as a separate line
FringesEmployer taxes and benefit contributionsRates in force where the crew is hired
Payroll handlingA percentage of gross wagesThe payroll provider's agreement
Budgeted cost of the positionThe only figure the budget cares aboutThe crew line
Hands holding a calculator over a stack of paperwork and files on a wooden desk
Between the rate you were quoted and the cost you carry there is not one calculation but a stack of them — and every one moves when the schedule does.

What software does with rates, and what it will not decide

In Soldum, crew engagements are attached to the days of the shooting schedule rather than typed into a separate sheet. The number of paid days comes from the plan — prep, travel and wrap included — and the wage total and its associated charges are recalculated every time the schedule changes. Rates entered are checked against the collective minimums for French film and television production, so an engagement below the floor surfaces before the contract instead of after payroll. The resulting figure feeds the budget alongside the rest of the production. Full disclosure: Soldum publishes one of the solutions described on this page. What no tool decides for you: which agreement governs the hire, how an unusual position should be classified, what a head of department is worth in a crowded window, or anything your production lawyer and payroll provider are there to confirm. The value is recalculation and early warning, not legal advice.

What's your pre-production challenge?

What kind of project are you preparing?
What takes you the most time today?
How do you work right now?

Frequently asked questions

What does a film crew day rate include?

+

Labour for a working day of an agreed length, on the days the production books. It does not include overtime beyond that day, night or weekend premiums, kit fees, employer taxes and benefit contributions, payroll handling, or per diems and travel. Those are added on top, and together they are far from a rounding error.

Why does this page not list actual day rates?

+

Because rates vary by territory, department, union agreement and season, and any figure published in an article is out of date the moment an agreement is renegotiated. The reliable sources are the current agreement for your territory and the quotes you receive. What is stable, and what this page covers, is the structure of the calculation.

Can I get a day rate by dividing a weekly rate?

+

Not safely. A weekly rate buys a defined number of days and usually reflects a discount for booking continuity, which disappears when you book a single day. Both rates also assume a length of day, and that assumption changes what the number means. Dividing gives you a negotiating reference, not a rate.

What is a kit fee, and should it sit in the crew line?

+

A kit fee or box rental pays for equipment a crew member brings to the job — a sound bag, a personal lighting kit, a DIT's hardware and licences. It is quoted separately from labour and usually treated differently for tax and fringe purposes, so it should stay its own line rather than being blended into the rate.

How many days should I budget per position?

+

Read them from the shooting schedule, not from the shoot-day count. Heads of department prep before the first call, travel days to and from locations are generally paid, and wrap continues after the last shot. Departments budgeted on shoot days alone are routinely invoiced for a third more.

Does Soldum calculate crew costs?

+

Soldum attaches crew engagements to the days of the shooting schedule, recalculates the wage total and its charges whenever the schedule changes, and checks entered rates against the collective minimums for French film and television production. The result feeds the production budget. The tool recalculates and flags; it does not give legal advice.

Related reading

Informational and non-binding page. Crew rates, working-day definitions, overtime bands, premiums and minimum rates are set by union and collective agreements and by local law, they differ by territory, and they are revised periodically. No amounts are reproduced here for that reason. Check the agreement that applies to your production and confirm unusual cases with your production lawyer and payroll provider before committing. Soldum publishes one of the solutions described.